The audit lane keeps the field queue readable to supervisors and compliance reviewers before a half-synced packet becomes the system of record.
Reviewer-first posture
Clear the rooftop safety packet sync warning before the next permit submission, or supervisor sign-off will outrun the evidence trail.
| Audit | Window | Status | Inspector | Risk | Next action |
|---|---|---|---|---|---|
| North garage retrofit FA-17 |
today · 4:30 PM | watch | M. Torres | Photo packet missing one remediation closeout image. | Re-open packet and capture the final barrier photo before upload. |
| Utility trench inspection FA-21 |
today · 6:00 PM | healthy | J. Reed | All required observation points are present and timestamped. | Hold for supervisor sign-off after sync completes. |
| Clinic generator room FA-24 |
tomorrow · 8:00 AM | blocked | A. Shah | Offline packet has not synced and the supervisor note references a newer checklist revision. | Reconcile checklist version and sync before the compliance packet is exported. |
| Distribution yard walk FA-29 |
tomorrow · 11:00 AM | watch | C. Evans | Temperature log attachment uploaded, but route note is still draft-only. | Promote the route note into the evidence packet so the audit record is complete. |
| Solar inverter enclosure FA-31 |
tomorrow · 1:30 PM | healthy | R. Kim | Evidence, defects, and remediation owner are aligned. | No action beyond scheduled closeout review. |