KINETIC GAIN · field audit mobile
Kotlin mobile-first operator surface
offline evidence · sync trust · supervisor review
field audit mobile control plane

Capture mobile evidence safely before sync gaps become permit, safety, or compliance failures.

This Kotlin operator surface makes the field packet visible: which audits are safe, which media bundles are incomplete, and where supervisor sign-off is being asked to outrun the actual evidence trail.

Lead recommendation

Reviewer-first posture
Clear the rooftop safety packet sync warning before the next permit submission, or supervisor sign-off will outrun the evidence trail.

Overview

field packet pressure + supervisor trust
5
Active audits
Audits currently in motion across field teams and supervisors.
1
Blocked audits
Audit flows unsafe to export until evidence or checklist drift is fixed.
2
Offline packets
Packets still relying on device-side capture before sync completion.
2
Sync warnings
Signals that packet state and cloud truth may be drifting apart.
2
Escalations
Supervisor or compliance interventions still open.
offline-first mobile capture + governed sync + supervisor sign-off
Operator posture
Mobile evidence capture treated like a governed operating system, not just a checklist app.

Audit lane

highest-risk packets first
F-01
watch

North garage retrofit

today · 4:30 PM · inspector: M. Torres

  • Photo packet missing one remediation closeout image.
  • Next action: Re-open packet and capture the final barrier photo before upload.
F-02
healthy

Utility trench inspection

today · 6:00 PM · inspector: J. Reed

  • All required observation points are present and timestamped.
  • Next action: Hold for supervisor sign-off after sync completes.
F-03
blocked

Clinic generator room

tomorrow · 8:00 AM · inspector: A. Shah

  • Offline packet has not synced and the supervisor note references a newer checklist revision.
  • Next action: Reconcile checklist version and sync before the compliance packet is exported.
F-04
watch

Distribution yard walk

tomorrow · 11:00 AM · inspector: C. Evans

  • Temperature log attachment uploaded, but route note is still draft-only.
  • Next action: Promote the route note into the evidence packet so the audit record is complete.